"I was astonished at how quickly the modules were put in place. Throughout this entire phase PKL Healthcares staff kept me fully updated with progress.. I have no hesitation in complimenting PKL Healthcare on a job well done."
Terry Johnson
Hull Royal Infirmary
About Us   -   Contact Us   -   Directions
The off-site construction system adopted by PKL Healthcare uses pre-engineered modular units that are transported from the factory and installed on site as fitted-out and serviced building blocks.
The units are installed together to form complete modular healthcare buildings, such as temporary ward facilities and other hospital buildings.
We take off-site construction to the next level, using volumetric construction techniques to provide complex, M&E intensive healthcare facilities, such as temporary operating theatres, temporary diagnostic imaging suites and modular laboratories with all M&E installed off-site in the factory.
In a sensitive medical environment off-site construction offers enormous benefits to the wellbeing of hospital patients and staff.
We minimise the time spent on your site, conducting as much as 80% of construction off-site in controlled factory conditions, meaning:
We deliver our healthcare facilities to site close to completion, eliminating the need for heavy machinery for 95% of the programme, dramatically reducing hospital noise and congestion.
By completing on-site enabling works and off-site construction simultaneously we can deliver turnkey hospital buildings up to 60% faster than traditional site-based construction.
Using our standard designs for modular operating theatres and modular wards we can meet urgent requirements from order to handover in as little as 12 weeks. This makes our off-site construction system ideal for urgent decant and disaster recovery situations.
Contact us now to arrange an initial meeting and see how we can deliver your project faster than you may have thought possible
© PKL Healthcare Ltd |
All Rights Reserved |