"Astonishingly one ward and an ultra clean operating theatre were made available within 16 weeks and have now enabled a significant reductions in the waiting list for replacement hips and knees in the North West of England"
Steve Taylor
Southport & Ormskirk Hospital NHS Trust
About Us   -   Contact Us   -   Directions
PKL Healthcare were employed through OGC Buying Solutions to provide two temporary day surgery theatres, a 6-bed recovery area and 22-bed temporary ward for an 18-month hire contract.
As well as providing the modular healthcare building, PKL Healthcare took on the enabling package into their scope of works, which, due to the location, included a mixture of a steel podium over a lower ground floor plant area, re-enforced concrete columns and traditional pad foundations.
The 2-storey facility is linked into the existing hospital on both floors. It features a 22-bed modular ward on the ground floor split into four 5 and 6-bed sections and supported by ancillary utility areas. On the first floor are two separate temporary day surgery theatres and a 6-bed 1st stage recovery area. The plant rooms housing the M&E installations to service the facility are on top of the 2nd storey accessible from the existing hospital rooftop. A bed lift was also installed to allow easy access between levels without the need to go through the existing hospital building.
Contact us now to arrange an initial meeting to start your own project
© PKL Healthcare Ltd |
All Rights Reserved |